Proposals for the Mossley Hall Farm site
We’re currently exploring plans for a new specialist ÅÝܽÊÓÆµ, veterinary and rehabilitation centre for animals most in need.
Status: planning application open for comments
Our planning application is now open for comments with Wigan Council. Please share with the council why you support the proposal by leaving a comment on the link below.
Jump to
Overview of the proposals
We want to bring key services together on one site, supporting animals – particularly those with the most complex medical and behavioural needs – through their journey from rescue through to recovery.
Bringing these services together would help improve how care is provided, reduce delays and relieve pressure on existing facilities.
A joined-up approach to care
The layout of the site is designed around how animals are cared for.
Animals arriving at the centre may need:
- immediate medical treatment
- rehabilitation
- ongoing behavioural support before rehoming.
By bringing specialist vet, behaviourist and rehabilitation teams together on one site, we can deliver care more quickly and improve outcomes for animals.
Wider benefits to the area
In addition to supporting ÅÝܽÊÓÆµ, the proposed facility is expected to bring wider benefits to the area, including:
- employment for around approximately 120 people, alongside opportunities for volunteers
- opportunities for training, skills development and education
- potential partnerships with local organisations and colleges.
The facility would support a range of roles, including veterinary professionals, animal care staff and operational teams.
We want our new site to become a place for the community, provide jobs, training and volunteering opportunities, as well as spaces for people to come together to learn and to take action for animals.
The new facility is expected to support a wide range of services
The proposed centre would be a one-stop-shop site, bringing together medical and behavioural care to give rescued animals the best possible chance for future happiness.
- Veterinary facilities for specialist lifesaving treatment and routine care
- Areas for animal intake, triage and assessment
- Rehabilitation and recovery spaces
- Rehoming and behavioural support
- Education and community space
- Offices and operational areas.
Funding
The proposed centre has been made possible by a generous donation from a charitable trust, alongside investment from the RSPCA and support from a wider fundraising campaign.
The proposed site and layout
Mossley Hall Farm includes agricultural land, existing farm buildings, trees and hedgerows. The application proposes replacing the farm buildings with a centre arranged in smaller groups of buildings around the existing farmstead.
Most buildings would be single storey, with a limited two-storey element in the veterinary and administration building. The arrangement would also create more contained spaces for animal treatment and recovery.
The approach we’re proposing would also help to create quieter, more contained spaces for animals.
Design approach
The design puts animals' needs first, giving them the best possible chance of recovery while being considerate of our neighbours and local wildlife.
The plans include:
- Carefully positioned buildings to help reduce noise and disturbance.
- Separate areas for visitors and animals receiving care.
- Kennels arranged to limit direct views between animal spaces, helping to reduce disturbance.
Existing trees and hedgerows, together with new planting, would help screen the buildings. The kennels would also include insulation and other measures to help reduce noise reaching the surrounding area.
This layout is intended to:
- Reduce the prominence of buildings in views from the surrounding area.
- Retain substantial areas of open land.
- Work with existing trees, hedgerows and woodland.
- Respond to the site's ecological features and areas at risk of flooding.

Access and movement
Traffic and road safety were important concerns raised during consultation, and have helped shape the plans.
The traffic assessment submitted with our application draws on surveys of local roads and information from another RSPCA centre. It concludes that the expected increase in traffic would be modest and could be accommodated safely. Wigan Council will consider these findings as it assesses the application.
The centre would use the existing entrance from Byrom Lane, which would be widened to allow vehicles to pass safely. There would also be passing places along the access road and measures to help keep vehicle speeds down.
Public right of way
To maintain public access while giving rescued animals space and peace to recover, we propose moving the footpath through the middle of the site to a route closer to Pennington Flash.
This approach would:
- Keep a public route through the area.
- Help reduce disturbance to animals during treatment and recovery.
- Keep walkers away from the centre's working areas.
- Maintain connections with the surrounding footpath network.
- A new crossing point with an island in the middle of Byrom Lane, and a connecting pavement, would help people reach the footpath.
If planning permission is granted, we would still need separate approval to change the footpath's route.
We also considered requests for a bridleway, but could not include one because of limited space, the centre's needs, safe connections to surrounding routes and maintenance.
Public transport and active travel
Bus services on Slag Lane connect the area with Leigh, Golborne and other nearby towns.
The plans include paths around the centre, covered cycle parking and staff changing facilities. Our submitted draft Travel Plan explains how we would encourage staff, volunteers and visitors to walk, cycle or use public transport where possible.
Parking and servicing
Parking would serve staff, visitors and the vehicles our teams use to care for animals.
The plans include:
- 195 parking spaces, including 12 accessible spaces, for staff, visitors, RSPCA vehicles and events.
- Around 12 covered cycle parking spaces.
- Charging points for up to six electric vehicles at a time.
- Access for deliveries and emergency vehicles.
Parking has been moved away from the front of the site, where trees and new planting would help screen it from view. The space provided takes account of everyday activity and occasional education, community outreach and fundraising events.
Environmental considerations
We care about animals, people and our planet. The importance of Pennington Flash to wildlife and local people has helped shape our plans. Studies of wildlife, landscape, noise and flood risk have been submitted with the application to explain the likely effects of the centre and how we would manage them.
Environment context
The site is located on the edge of Lowton, next to Pennington Flash. Pennington Flash is an important area for wildlife and recreation.
It forms part of a wider network of nature sites, including a Local Nature Reserve and National Nature Reserve, and is a recognised wildlife corridor.
The site is also located within the Green Belt, and we recognise this is an important consideration.
Our considerations
Our new centre will be environmentally considerate, and we are committed to enhancing the site so that it attracts more wildlife for generations to come.
The proposals are being developed to respond to the clear need for a centre of this kind, while carefully considering the site and its surroundings.
Ecology and biodiversity
Surveys have helped us understand the wildlife and habitats on the site, including bats, breeding birds, badgers and amphibians. The findings have shaped both the layout and the steps we would take to protect wildlife during building work and once the centre opens.
We would retain most existing trees and hedgerows, alongside new native planting, grassland that supports a wider variety of plants and wildlife, and other habitat improvements.
These measures would deliver at least 10% biodiversity net gain on site: a measurable improvement in wildlife habitats. The habitats would be cared for and checked over time to help ensure those benefits last.
Our considerations
Our aim is to protect existing wildlife and create better places for it to thrive. We would avoid harm wherever possible and take steps to reduce any impacts that cannot be avoided.
The plans include carefully designed lighting, bird and bat boxes, and measures to protect wildlife during the work. Where trees or sections of hedgerow need to be removed, we would provide replacement planting. Any work affecting protected species would follow the relevant requirements, with licences obtained where needed.
Our approach to design
Existing trees, woodland and hedgerows have helped shape where the buildings would go, so the centre can sit sensitively within its surroundings.
The plans aim to:
- Keep important natural features wherever possible.
- Use building heights, materials and planting that help the centre fit into the landscape.
- Keep buildings away from the more sensitive parts of the site.
This approach would help us provide the care rescued animals need while being considerate of local people, wildlife and visitors to Pennington Flash.
Landscape and visual impact
The centre would be made up of smaller groups of buildings, with planting between them and around the site. Most would be single storey. The smaller two-storey part would be positioned where existing trees help screen it from view.
We recognise that building the centre would change some local views. The landscape assessment submitted with the application concludes that the effects further afield would be limited, with new trees and planting helping the buildings blend into their surroundings as they grow.
Environmental sustainability
We want to use energy and water carefully and reduce the centre's impact on the environment. The buildings would run on electricity, with no gas connection. Solar panels, air source heat pumps, good insulation and energy-efficient equipment are included in the plans.
Other measures include roofs covered with plants on several buildings, electric vehicle charging and collecting rainwater for reuse. Water-saving measures and an on-site system for treating wastewater are also proposed, with the necessary approvals required.
The centre is aiming for a BREEAM Excellent rating, a recognised assessment of how well buildings perform across areas such as energy, water use and their impact on the environment.
Flood risk and drainage
Flood risk has been carefully assessed as part of the application. Although some parts of the wider site are at greater risk of flooding, the buildings, roads and other facilities would be in the area where river flood risk is low, known as Flood Zone 1.
The plans include ponds to hold rainwater, paving that allows water to pass through it, and rainwater collection for reuse. These measures would control how quickly water leaves the site and are designed to avoid increasing flood risk elsewhere, taking climate change into account.
Supporting the wider area
We know how much Pennington Flash means to local people. Our plans seek to support its future as a place for wildlife and recreation.
New planting, better habitats and the proposed footpath arrangements would help support wildlife and keep the area accessible, alongside the specialist care the centre would provide for rescued animals.